TALENT AND PRECISION WORKS
Its multi-year experience have allowed the company for over 70 renewable energy plants of different power and features:
- hydroelectric with high hydraulic jumps (with penstock)
- hydroelectric power with reduced hydraulic jumps (on mesh channels or ditches)
- hydroelectric in riverbed (with or without crosspiece)
- revamping of existing hydroelectric plants
- biomass and biogas
Cobet Ltd allows gives the possibility to be the customer’s only interlocutor in the system construction with “Turn-key” solution.